Fast progress with Insulated Concrete Form, ICF; MMC at its best

We’re making good progress now with the ICF blocks and the ground floor walls to the new West wing are complete. The next stages are to lay the next level floor structure to create a deck to work from to then build up the first floor walls etc. Watch this space for more 360 video footage of works with more modern methods of construction around the house.

10mm water-proof aggregate poured between the ICF blocks